Description
Ultra-modern logistics warehouse of around 28,000 sqm, close to the La Louvière container terminal "Garocentre" operated by Duferco. Garocentre enjoys excellent accessibility with direct access to several motorways at the junction of the major highways E42 and E19 with a terminal on the Canal du Centre connecting the Scheldt and the Seine with the Meuse and the Rhine and with a rail link less than an hour's drive from the Brussels, Brussels-South, Liège and Lille airports.
Availabilities
-
HOUDENG-AIMERIES
Floor Unit Type floor area Availability Ground floor Unit 1 Warehouse 12108 m² After delivery Floor 1 Mezzanine 2900 m² After delivery Ground floor Office 598 m² After delivery Ground floor Unit 2 Warehouse 11567 m² After delivery Floor 1 Mezzanine 1722 m² After delivery Ground floor Office 549 m² After delivery
Photos
Location
Similar properties
logistics
Route du Grand Peuplier 6, 7100 LA LOUVIÈRE
FOR RENT —from 4172 m² until 40046 m²
Meer info