Description
The site was built in 2012 (Willy Naessens) with high-quality materials and a modern appearance in a prominent visible location, so that the site strengthens the identity of the tenant/user's company.
At the front of the site are the furnished offices/showroom on 2 floors, each measuring approximately 585 m². Furthermore, in the striking "tower" at the front there are 2 shell offices of approximately 36 m2 each (3rd + 4th floor). Behind the offices is the warehouse space of approximately 846 m².
Office
- located on the front facade on the ground floor, 1st, 2nd and 3rd floor (view of the E19 motorway)
- entrance hall with stairs (lift shaft available)
- relief
- aluminum turn-tilt windows with double glazing
- electricity, data and telephone connections
- alarm system
- natural gas heating
- partly landscape office (open) and partly divided
- kitchenette + dining area
- sanitary facilities ladies and gentlemen